Installing Equus Stall Systems

<< Back | Page 3| Next >>
Side Wall System Assembly

Step 1: Install the end channels centered on the inside surface of the corner posts, as shown in the Assembly Drawing. All channels should be placed 1/2" above the floor surface and anchored with the 3/4" truss-head screws supplied.

For solid wood walls, fasten two (2) end channels to each post, one directly above the other.

For grill work walls, fasten only one (1) end channel at the bottom of each post.

Step 2: You are now ready to install the wall lumber. Slide the first board down to '/2" below the bottorn of the end channels. After the bottom board is located and leveled, anchor it in place with the truss-head screws supplied. Note: Rubbing soap on the inside surface of the end channels will let the wood slide easier.

For solid wood walls, continue installing all remaining wall boards and secure in place with the 3/4" truss-head screws supplied. Complete installation by adding two (2) wall braces (item 3) vertically. one above the other, and centered on the wall. Secure with '/4 " truss-head screws supplied.

For grill work walls, continue installing wall boards up to the top of the lower end channels. Finally, install one wall brace (item 3) below the grill work.

Step 3: Using the truss-head screws, install two (2) header channels, one on the corner post and one on the center post 35'/4' above the top 2' x 10" wall board. The 35 1/4° dimension is from the top of the 2` x 10 to the bottom of the header channel

Step 4: The grill work pipes have two dimples on each end which are used to hold the pipes in the U channels. To assemble, make sure a plastic grommet is installed in each pipe hole in the U channel then push
the pipes into the U channel until they snap into place.

Note: If you plan to install a Model 4250 Feeder Door into the grill work, remove three bars from the area where you want the door located. Slip the Feeder Door over the pipe by the opening. This pipe will act as a hinge. The spring loaded latch must face toward the aisle.

After all pipes are in place, place the grill work assembly over the wall board and press down until the pipes come into contact with the lumber.

Step 5: Slip the header board (2"x 6") into the header channels installed in step 3, and slide down until it rests firmly on top of the pipes in the grill work.

Step 6: At this point, the remaining 3/4" truss-head screws should be installed in the header channels and the upper and lower grill work U channels.

Step 7: Using the 1/4" truss-head screws furnished, install the wall brace (item 3) centered vertically on the wall below the grill.